As with all good building projects progress takes time! We are now ‘semi-finished’. The building work is long since complete. Fit-out of the interior is just about there (room partitions, doorways, wall lining, stairs, built in beds and storage, bathrooms, toilet cubicles, showers, and more). Plumbing….mmm tough one but it’s coming.
Off to a different room.
Same room – other direction
One bed in the opening above the draws – then there is a top bunk bed above that (hidden in this picture). Bunk beds to the right with draws underneath. That makes four beds. And the fifth bed – it’s flying overhead.

Looking from the main entrance hall to the stairs up to the rooms inside. Doorways to the left up first flight and up second flight to the right. Split level design (nightmare).
the sinks are really thoughtful and also super cute.
On Thu, Apr 2, 2020 at 1:22 PM Eastern Highlander wrote:
> easternhighlander posted: “As with all good building projects progress > takes time! We are now ‘semi-finished’. The building work is long since > complete. Fit-out of the interior is just about there (room partitions, > doorways, wall lining, stairs, built in beds and storage, bathrooms” >
It looks wonderful. Didn’t realized it took that long to build a log cabin.