The foundations are in place, the floor is down so next the walls go up…
The floor to ceiling windows were made as units of four in the workshop then held in place until the walls are built to support them.

Tree house walls start to go up
Didymus practicing building by interlocking planks at the corners (just in case we need to know this technique in the future …. stay tuned wood lovers…).

Interlocking planks at the corners
We layered shinda (string) in-between the planks to provide a first form of gap closing / draft proofing for where planks were not perfectly machined.

Placing string between each plank

Front door frame with lintel

Delight and Edmore wall building

You get the idea now!

Tree house north wall at sunset

Tree house back door frame facing west

Looking out of the window in Nyanga direction (west)