Petra has puppies!

Petra has puppies!

Back in August Petra gave birth to seven small Jack Russell puppies in the high-tech Hornbydale birthing suite.  Yours truly was midwife for the day – though in the end Petra was an excellent mother and knew exactly what to do. Extra heat lamps provided as it was still winter here in Zim. In the … Continue reading →

The Tadpole Building: Part 2 – Utilities

The Tadpole Building: Part 2 – Utilities

Routes were chipped out of the brickwork for the electrical conduits prior to plastering the interior. (No nice cavity walls here) Next Mr Patrick 2 ‘plasters’ (with cement)  the exterior and interior. Chicken wire was used to add strength to the outside of the existing round rondavel. Mr Tadoka and Mr Paul the plumbers chipped … Continue reading →

The Tadpole Building: Part 1

The Tadpole Building: Part 1

This is our first building project! We are refurbishing the fire damaged rondavel below our house to make a study centre for the children. It started out as a single round room and will be steadily transformed into a two story building with an added ‘tail’  (below) containing the new entrance and bathroom downstairs. Here … Continue reading →