We add a brace to the overhanging cantilevered rafters.
Post and Beam construction – gum pole rafters going over the ridge pole – 4 January 21
Gum pole rafters (nungo) joined at the top in opposing pairs with rebar
Post and beam construction – the ridge pole is on – 4 January 21
We reach the top at 7.5m up!